The mega boring machine drilling rock at 9 meters a day for New York's new rail tunnel
Beneath New Jersey, a 1,680-ton, 150-meter-long tunnel boring machine is drilling through the hard rock of the Palisades cliffs at a planned rate of nine meters per day. The machine, with an 8.7-meter-diameter cutterhead, began digging on October 8 in North Bergen and will open a gallery of about 1.6 kilometers. It is part of the Palisades project, the first drilling phase of a $16 billion megaproject that envisions a new rail connection under the Hudson River and the rehabilitation of the existing tunnel.
In 40 seconds
- The boring machine weighs 1,680 tons, is 150 meters long and has an 8.7-meter-diameter cutterhead.
- It is designed to advance about nine meters per day, including scheduled maintenance stops.
- The first machine began drilling on October 8 in North Bergen and will open a gallery of about 1.6 kilometers.
IASummary generated by artificial intelligence from a story by El Confidencial. It may contain errors: the original source prevails.
%3Aformat(jpg)%3Aquality(99)%3Awatermark(f.elconfidencial.com%2Ffile%2F65c%2F43d%2F0ca%2F65c43d0ca5dbd5ff8f19b44167343db9.png%2C0%2C275%2C1)%2Ff.elconfidencial.com%2Foriginal%2Fcc6%2F893%2Fbba%2Fcc6893bbad6c6aeaa429f1dc167a6add.jpg&w=1200&q=75)



Comments
Be respectful. Comments reported by several people are hidden until a moderator reviews them.
You do not need an account to read, only to comment. Sign in with a code sent to your email or with your Google account. We only show the name you choose, never your email.