Wärtsilä to convert Brazil's Termocabo plant to gas and secures 10-year, 50 MW contract
Wärtsilä will carry out the natural gas conversion of the Termocabo power plant in Cabo de Santo Agostinho (Pernambuco, Brazil), which will stop using heavy fuel oil. The solution allowed Termocabo S.A. to take part in Brazil's 2026 Capacity Auction and win a 10-year PPA to supply 50 MW. The order was booked in the third quarter and operation is expected in July 2028. The EPC contract includes converting three Wärtsilä 46 engines to the 50SG configuration and upgrading electrical and automation systems.















