Wärtsilä to convert Brazil's Termocabo plant to gas and secures 10-year, 50 MW contract
Wärtsilä will carry out the natural gas conversion of the Termocabo power plant in Cabo de Santo Agostinho (Pernambuco, Brazil), which will stop using heavy fuel oil. The solution allowed Termocabo S.A. to take part in Brazil's 2026 Capacity Auction and win a 10-year PPA to supply 50 MW. The order was booked in the third quarter and operation is expected in July 2028. The EPC contract includes converting three Wärtsilä 46 engines to the 50SG configuration and upgrading electrical and automation systems.
In 40 seconds
- Wärtsilä will handle Termocabo's gas conversion under an engineering, procurement and construction (EPC) contract.
- Termocabo secured a 10-year PPA in the 2026 auction to supply 50 MW to Brazil's power system.
- Three Wärtsilä 46 engines will be converted to the 50SG configuration, with electrical, automation and auxiliary systems upgraded.
IASummary generated by artificial intelligence from a story by Inspenet. It may contain errors: the original source prevails.




Comments
Be respectful. Comments reported by several people are hidden until a moderator reviews them.
You do not need an account to read, only to comment. Sign in with a code sent to your email or with your Google account. We only show the name you choose, never your email.