Voith Hydro wins electromechanical contract for the 90 MW Jomori hydropower plant in Bhutan
Voith Hydro secured the electromechanical contract for the Jomori hydropower project, with 90 MW of installed capacity in Bhutan, awarded by state-owned Druk Hydro Energy. The scope includes engineering, manufacturing and supply of generating units, hydraulic turbines and auxiliary balance-of-plant systems, as well as detailed design, laboratory testing and assembly of powerhouse components. With this award, the German firm's portfolio in the country exceeds 294 MW, adding projects such as Nikachhu, Burgangchhu and Yungichhu.
In 40 seconds
- Voith Hydro won the electromechanical contract for the 90 MW Jomori plant in Bhutan, awarded by Druk Hydro Energy.
- The scope covers engineering, manufacturing and supply of turbines, generators and auxiliary systems, plus assembly at the powerhouse.
- Voith Hydro's portfolio in Bhutan exceeds 294 MW with projects such as Nikachhu (118 MW), Burgangchhu (54 MW) and Yungichhu (32 MW).
IASummary generated by artificial intelligence from a story by Inspenet. It may contain errors: the original source prevails.




Comments
Be respectful. Comments reported by several people are hidden until a moderator reviews them.
You do not need an account to read, only to comment. Sign in with a code sent to your email or with your Google account. We only show the name you choose, never your email.