• TRM (USD/COP)COP 3,297.07 +0.83% +COP 27.19Colombia's official exchange rate (Financial Superintendence), valid Nov 11 to Nov 12
  • EuroCOP 3,668.67 +0.05% +COP 1.82Reference: TRM crossed with the European Central Bank rate of Nov 11; not the market quote
  • Mexican pesoCOP 176.70 +0.26% +COP 0.46Reference: TRM crossed with the European Central Bank rate of Nov 11; not the market quote

Turkey and AtkinsRéalis study a 4.5 GW nuclear plant with six units

FinanceInternationalInspenetAI summary
Image: Inspenet

Turkish state-owned TUNAS and Canada's AtkinsRéalis, through its subsidiary Candu Energy, signed an agreement during COP31 in Antalya to evaluate building a 4.5 GW nuclear plant made up of six units. The deal includes a feasibility study due to conclude in 2027 and preliminary engineering and design work (FEED) through 2028, when a final investment decision would be assessed. The project remains at the study stage and its location has not been defined.

In 35 seconds

  • TUNAS and Candu Energy, an AtkinsRéalis subsidiary, will evaluate a six-unit, 4.5 GW plant
  • The feasibility study is due to conclude in 2027 and preliminary engineering and design in 2028
  • There is no investment decision or confirmed location yet; Turkey is weighing Sinop and Thrace
Read the full story at Inspenet

IASummary generated by artificial intelligence from a story by Inspenet. It may contain errors: the original source prevails.

Comments

Be respectful. Comments reported by several people are hidden until a moderator reviews them.

You do not need an account to read, only to comment. Sign in with a code sent to your email or with your Google account. We only show the name you choose, never your email.

    Keep reading