ORLEN Neptun begins wind measurement campaign at 4 GW Baltic West offshore park
ORLEN Neptun has started a wind and other resource measurement campaign for the development of the Baltic West offshore park in the Baltic Sea. The company selected Partrac, part of the Venterra Group, to install two floating buoys with V-LiDAR sensors in the concession area instead of fixed meteorological masts. The data will allow the company to calculate generation potential and define turbine layout, as well as structure the financial model and prepare for Poland's 2027 offshore wind auction. The project covers four areas on the Oder Bank with about 4 GW.
In 40 seconds
- ORLEN Neptun will deploy two floating buoys with V-LiDAR sensors at Baltic West, with Partrac (Venterra Group) as consultant
- The measurements seek certified data to calculate generation potential and site the turbines
- The records are a requirement to take part in Poland's offshore wind auction planned for 2027
IASummary generated by artificial intelligence from a story by Inspenet. It may contain errors: the original source prevails.





Comments
Be respectful. Comments reported by several people are hidden until a moderator reviews them.
You do not need an account to read, only to comment. Sign in with a code sent to your email or with your Google account. We only show the name you choose, never your email.