• TRM (USD/COP)COP 3,235.59 +1.65% +COP 52.60Colombia's official exchange rate (Financial Superintendence), valid Nov 4 to Nov 4
  • EuroCOP 3,617.08 +1.72% +COP 61.02Reference: TRM crossed with the European Central Bank rate of Nov 3; not the market quote
  • Mexican pesoCOP 173.98 +3.35% +COP 5.64Reference: TRM crossed with the European Central Bank rate of Nov 3; not the market quote

San Nicolás school in Pereira to be rebuilt with seismic isolator

TechnologyColombiaBlu Radio45 s readAI summary
Image: Blu Radio

The San Nicolás educational institution in Pereira will be rebuilt with anti-seismic technology after the damage caused by the earthquake, with an investment of between COP 22,000 million and COP 23,000 million, according to Daniel Perea, vice president of Terpel. The project will include a seismic isolator to reduce the transmission of energy from earth movements and allow the school to serve as a shelter. The works would take between 18 and 24 months, during which students will have alternating and virtual education.

In 45 seconds

  • Rebuilding the San Nicolás educational institution in Pereira would cost between COP 22,000 million and COP 23,000 million.
  • The project will include a seismic isolator to absorb part of an earthquake's energy and reduce its transmission to the structure.
  • The works would take between 18 and 24 months; during that period there will be alternating and virtual education to prevent dropouts.
Read the full story at Blu Radio

IASummary generated by artificial intelligence from a story by Blu Radio. It may contain errors: the original source prevails.

Comments

Be respectful. Comments reported by several people are hidden until a moderator reviews them.

You do not need an account to read, only to comment. Sign in with a code sent to your email or with your Google account. We only show the name you choose, never your email.

    Keep reading