Indra wins contract worth more than $44 million to modernize tolls in California
Indra, through its subsidiary Indra Group USA, was awarded a contract worth more than $44 million (about 40 million euros) with the Capital Area Regional Toll Authority (CARTA) to deploy a free-flow tolling system on the future Yolo 80 Express Lanes on Interstate 80 between Davis and Sacramento. The project covers design, installation, testing, warranty and maintenance of the tolling system and automatic high-occupancy vehicle detection across 27 kilometers, alongside Parsons Transportation.
In 35 seconds
- The contract exceeds $44 million, about 40 million euros, with the US entity CARTA
- Indra Group USA will deploy free-flow tolling and automatic high-occupancy vehicle detection on 27 kilometers of Interstate 80
- The corridor links Davis and Sacramento and includes the Yolo Causeway viaduct, used by about 150,000 vehicles a day
IASummary generated by artificial intelligence from a story by 20Minutos. It may contain errors: the original source prevails.




Comments
Be respectful. Comments reported by several people are hidden until a moderator reviews them.
You do not need an account to read, only to comment. Sign in with a code sent to your email or with your Google account. We only show the name you choose, never your email.